Mixer truck parts,Color could be customized,Other length are also available
44B60, Length 5'(60"), 380-215805
44B72, Length 6'(72"), 380-215806
44B84, Length 7'(84"), 380-215807
44B96, Length 8'(96"), 380-215808
44B108, Length 9'(108"), 380-215809
44B120, Length 10'(120"), 380-215810
44B132, Length 11'(132"), 380-215811
44B144, Length 12'(144"), 380-215812
44B156, Length 13'(156"), 380-215813
44B168, Length 14'(168"), 380-215814
44B180, Length 15'(180"), 380-215815
44B192, Length 16'(192"), 380-215816
44B204, Length 17'(204"), 380-215817
44B216, Length 18'(216"), 380-215818
44B228, Length 19'(228"), 380-215819
44B240, Length 20'(240"), 380-215820
44B252, Length 21'(252"), 380-215821
44B264, Length 22'(264"), 380-215822
44B276, Length 23'(276"), 380-215823
44B288, Length 24'(288"), 380-215824
44B300, Length 25'(300"), 380-215825
44B312, Length 26'(312"), 380-215826
44B324, Length 27'(324"), 380-215827
44B336, Length 28'(336"), 380-215828
44B348, Length 29'(348"), 380-215829
44B360, Length 30'(360"), 380-215830
Product Parameter
|
Product Name |
Mixer Drum Forged Track Ring |
|
Stroke |
4" |
|
Length |
23ft(276") |
|
Cross No. |
380-215823 |
|
End fitting thread |
1/4-28UNF |
|
Nut thread |
5/8-18UNF |
Product Feature
1).High quality material, Easy to control
2).High quality materials to extend the service life of electrical parts
Product Details
| Price | Negotiable |
| Payment term | TT, LC |
| Delivery date | Negotiable |
| Packing | export standard |
| Market | Middle East/ Africa/Asia/South America/Europe/North America |
| Warranty | 1 year |
| MOQ | 1 set |
Our Advantages
1). Fast installation
2). High quality products
3). Strict quality management system
4). Professional services
5). Fast delivery
6). Smooth operating
Our Services
1).Provide the technical solutions;
2).Designing and manufacturing of non-standard equipment; 3).Professional technical training and guidance on site according to the contract;
4).Supply accessories at any time;
5). Other special technical service according to client's requirements.
Quality Assurance
1). Strict control raw material before producing.
2). Checking one by one before the assembling
3). Checking one by one during the production
4). Have the random inspection before the delivery.
Our history
1).2010 Zhongyi machinery Co.,Ltd. Founded, with main products of spare parts for concrete pumps and concrete mixer trucks.
2).2011 Zhongyi machinery started to cooperate with ACM located in Italy, our products entered EU market.
3)2016 start cooperating with TRI who is famous distributor in middle East countries, we provide the all kind of parts. And meanwhile we started cooperated with Zoomlion customer in South east Asia.
4).2019 we purchased one factory for manufacture the casting products, and began to cooperate with the biggest pump part distributor in UAE.
5).2023 our company has passed the ISO quality system registration, and has obtained ISO 9001:2008 certificate.
6).2024 our set up our oversea branches in Oman Muscat.
Our factory and warehouses

Our Exhibitions

FAQ
Q: How long can I expect to get the sample?
A: After you pay the sample charge and send us confirmed files, the samples will be ready
for delivery in 1-3 days. The samples will be sent to you via express and arrive in 3-5 days.
Q: What about the lead time for mass production?
A: Honestly, it depends on the order quantity and the season you place the order.
Alway 25-28days based on general order .
Q: What is your terms of delivery?
A: We accept EXW, FOB, CFR, CIF, etc. You can choose the one which is the most convenient or cost effective for you.
Q: Where is your factory located?
A: In Jimei industry area,Xiamen city,China.
Hot Tags: liebherr mixer control cables, China liebherr mixer control cables manufacturers, suppliers, factory, CIFA Mixer Truck Drum Roller, Liebherr Mixer Control Cables, Main Chute McNeilus MTM 440 152625, Mixer Drum Concrete Mixer Assembly, Mixer Drum Forged Track Ring, mixer truck parts

