Concrete Pump Parts Putzmeister S Valve

Concrete Pump Parts Putzmeister S Valve
Details:
The S-valve is a core component in concrete pumping equipment, designed to switch the flow of concrete between the hopper and the delivery pipeline. Its S-shaped channel enables efficient concrete conveyance, while the hydraulically actuated cutting ring and wear plate work together to ensure sealing and directional switching, allowing for continuous and stable pumping operations.
Send Inquiry
Description
Send Inquiry

 

Product Parameter

product-624-785

Product Feature

 

1).Famous brand, Easy to install.
2).High quality materials to extend the service life of hart parts
3).The operation is easy and can improve the working efficiency of the concrete pumps.

 

Product Details

 

Price Negotiable
Payment term TT, LC
Delivery date Negotiable
Packing export standard
Market Middle East/ Africa/Asia/South America/Europe/North America
Warranty 1 year
MOQ 1 set

 

Our Advantages

1). Fast installation

2). Smooth operating

3). Strict quality management system

4). Prompt delivery
5). High quality products

 

Our Services

 

1).Provide the technical design and solutions;
2).New plant construction guidance;
3).Designing and manufacturing of non-standard equipment; 4).Professional technical training and guidance on site according to the contract;
5).Supply accessories at any time;
6).Tele-technical consulting and services;
7). Other special technical service according to client's requirements.

 

Quality Assurance

 

1). Checking raw material before producing.

2). Checking one by one before the assembling

3). Checking one by one during the production

4). Have 100% inspection before the delivery.

 

Our history

 

1).2010 Zhongyi machinery Co.,Ltd. Founded, with main products of spare parts for concrete pumps and concrete mixer trucks.
2).2011 Zhongyi machinery started to cooperate with ACM located in Italy, our products entered EU market.
3)2016 start cooperating with TRI who is famous distributor in middle East countries, we provide the all kind of parts. And meanwhile we started cooperated with Zoomlion customer in South east Asia.
4).2019 we purchased one factory for manufacture the casting products, and began to cooperate with the biggest pump part distributor in UAE.
5).2023 our company has passed the ISO quality system registration, and has obtained ISO 9001:2008 certificate.
6).2024 our set up our oversea branches in Oman Muscat.

 

Our factory and warehouses

 

product-1271-686

 

Our Exhibitions

 

product-1269-669

 

FAQ

 

Q: When can I get the price?
A: Usually we quote within 8 hours after we get your inquiry.

Q: How long is your delivery time?

A: The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days.

Q: Do you provide sample ? Is it free?

A: If the sample is low value, we will provide the free sample with freight collect. But for some high value samples, we need to collect the sample charge.

Q: What is your term of payment?

A: 30% down payment before producing and 70% balance payment before shipping.

 

 

 

 

Hot Tags: concrete pump parts putzmeister s valve, China concrete pump parts putzmeister s valve manufacturers, suppliers, factory, Boom Truck Hydraulic Pump, Concrete Pump Outrigger Vertical Cylinder Seal Kits 63 80, concrete pump parts, spare parts for putzmeister, Spectacle Wear Plate Wear Ring 229488005, Upper Housing Assembly

Send Inquiry